|
|
 |
|
|
| EW#248 provides for civil and criminal investigations and insurance industry cases (both plaintiff and defendant) that involve Air Quality Modeling, Forensic Meteorology and Weather Event Re-Construction....
|
 |
|
|
| EW #1459 BS, CFEI is a proven professional in the evaluation and investigation of vehicle related injuries and defects.
|
 |
|
|
| Experienced Real Estate professional with a diverse background.
|
 |
|
|
| Industrial & Utility power generation and cogeneration expert. 30 years hands-on experience with plants from 100 kW to 1,000 MW. Extensive International experience arbitrations & litigations expert.
|
 |
|
|
| Expertise in electrical devices and electronics technology.
|
 |
|
|
| GEO Associates provides litigation support and expert witness testimony for cases that involve Forensic Geology, Geophysics, and Meteorology including Weather Event Re-Construction and Force Majeure.
|
 |
|
|
| CPA with over 35 years experience with litigation support matters
|
 |
|
|
| EW #2556 has been providing consultation and expert services to the legal and insurance industry since 1983.
|
 |
|
|
| Forty years designing and implementing telecommunications and computer technology for Wall St. and domestic & foreign banks.
|
 |
|
|
| EW #3035 is a certified Motor Vehicle Accident Reconstruction & Cause Analysis professional providing service to law firms and insurance companies that require accident reconstruction for use in civil litigation....
|
 |
|
|
| Expert in plastic and rubber failure analsyis and evaluation. Experience in commercial and litigation projects.
|
 |
|
|
| Services are for PC's and laptops, stand alone units.
|
 |
|
|
| Dr. Mayer is an academic epidemiologist and biostatistician trained in medicine, psychiatry and statistics. He divides his time between Baltimore and Phoenix. He has done expert witnessing for 30 years....
|
 |
|
|
| 35 years experience in engineering, construction, claim preparation and litigation support. Specializing in fire protection and HVAC disputes for large commercial and heavy industrial projects.
|
 |
|
|
| Looking for a data center construction expert?
|
 |
|
Find Data Center Construction experts and consultants for Data Center Construction litigation support at www.ewitness.com. Available to be Data Center Construction expert witnesses and provide Data Center Construction forensic consulting in Data Center Construction litigation, in addition prepare Data Center Construction expert witness reports for use in deposition and/or in-court trial testimony.
|
Categories To Find "Data Center Construction" Experts:
|
ADJUDICATION, MEDIATION / CONCILIATION |
|
Adjudication is the legal process by which an arbiter or judge reviews evidence and argumentation including legal reasoning set forth by opposing parties or litigants to come to a decision or judgment which determines rights and obligations between the parties involved.
Mediation, in a broad sense, comprises an act of bringing two states, sides or parties closer or together. This article discusses the communication sense of the term. Separate articles, cultural and biological, treat of other senses of mediation.
Mediation consists of a process of alternative dispute resolution in which a (generally) neutral third party, the mediator, using appropriate techniques, assists two or more parties to help them negotiate an agreement, with concrete effects, on a matter of common interest. More generally speaking, the term mediation covers any activity in which an impartial third party (often a professional) facilitates an agreement on any matter in the common interest of the parties involved.
Mediation applies to different fields, with some common peculiar elements and some differences for each of its specialties. The main fields of mediation include commerce, legal disputes and diplomacy, but forms of mediation appear in other fields as well. Mediation in marriage technically belongs in the category, although it has followed its own peculiar history since the times of ancient Greeks: compare marriage counselling.
|
AFFIRMATIVE ACTION |
|
Affirmative action (U.S. English), or positive discrimination (British English), is a policy or a program aimed at increasing the representation of members of groups that have traditionally been discriminated against. This typically focuses on education, employment, government contracting, health care, or social welfare.
|
ARBITRATION / MEDIATION |
|
Arbitration is a form of mediation or conciliation, where the mediating party is given power by the disputant parties to settle the dispute by making a finding. In practice arbitration is generally used as a substitute for judicial systems, particularly when the judicial processes are viewed as too slow, expensive or biased. Arbitration is also used by communities which lack formal law, as a substitute for formal law.
Mediation consists of a process of alternative dispute resolution in which a (generally) neutral third party, the mediator, using appropriate techniques, assists two or more parties to help them negotiate an agreement, with concrete effects, on a matter of common interest. More generally speaking, the term "mediation" covers any activity in which an impartial third party (often a professional) facilitates an agreement on any matter in the common interest of the parties involved.
|
BANK COMPLIANCE |
|
Compliance requirements are a series of directives established by United States federal government agencies that summarize hundreds of federal laws and regulations applicable to Federal assistance.
Bank regulations are a form of government regulation which subject banks to certain requirements, restrictions and guidelines, aiming to uphold the soundness and integrity of the financial system.
A bank is an institution that provides financial service, particularly taking deposits and extending credit.
|
BANKING |
|
A bank is an institution that provides financial service, particularly taking deposits and extending credit.
|
BANKING REGULATION |
|
Bank regulations are a form of government regulation which subject banks to certain requirements, restrictions and guidelines, aiming to uphold the soundness and integrity of the financial system.
A bank is an institution that provides financial service, particularly taking deposits and extending credit.
|
BICYCLE HELMETS |
|
A bicycle helmet is designed to provide head protection for cyclists. Helmets are most suitable for preventing injury in straight falls, and for reducing friction related damage to the head. Modern bicycle helmets were first developed in the 1970s.
|
COPYRIGHT - GENERAL |
|
Copyright is a set of exclusive rights granted by governments to regulate the use of a particular expression of an idea or information. At its most general, it is literally "the right to copy" an original creation. In most cases, these rights are of limited duration. The symbol for copyright is ©.
|
DATA COLOCATION CENTER |
|
A colocation center ("colo") or carrier hotel is a type of data center where [a] multiple telecommunications or network service providers locate their connections adjacent at the physical layer to each other's networks (points of presence) and [b] users of these services locate network, server and storage gear and interconnect to network service provider(s) with a minimum of cost and complexity.
|
DEMOLITION |
|
Demolition is the opposite of construction: the tearing-down of buildings and other structures. It is contrasted with deconstruction, which is the taking down of buildings while carefully preserving valuable elements for re-use.
|
DISASTER MANAGEMENT / RECOVERY |
|
Disaster management means a continuous and integrated multi-sectoral, multi-disciplinary process of planning and implementation of measures aimed at prevention and mitigation, preparedness, response, and recovery in relation to natural and man-made disasters. Disaster management therefore refers to programs and measures designed to prevent, mitigate, prepare for, respond to and recover from the effects of disasters.
|
DUE DILIGENCE |
|
Due diligence (also known as due care) is the effort made by an ordinarily prudent or reasonable party to avoid harm to another party or himself. Failure to make this effort is considered negligence. Quite often a contract will specify that a party is required to provide due diligence.
|
E-COMMERCE |
|
Electronic Commerce (also referred to as EC, e-commerce eCommerce or ecommerce) consists primarily of the distributing, buying, selling, marketing and servicing of products or services over electronic systems such as the Internet and other computer networks.
|
ERGONOMICS |
|
Ergonomics (or human factors) is the scientific discipline concerned with the understanding of interactions among humans and other elements of a system, and the profession that applies theory, principles, data, and methods to design in order to optimize human well-being and overall system performance (definition adopted by the International Ergonomics Association in 2000).
|
EXPERT WITNESS SALES |
|
An expert witness is a witness, who by virtue of education, or profession, or experience, is believed to have special knowledge of his subject beyond that of the average person, sufficient that others may officially (and legally) rely upon his opinion.
|
FIBER OPTICS |
|
An optical fiber (or fibre) is a transparent thin fiber, usually made of glass or plastic, for transmitting light. Fiber optics is the branch of science and engineering concerned with such optical fibers.
Optical fibers are commonly used in telecommunication systems, as well as in illumination, sensors, and imaging optics.
|
HYDROLOGY |
|
Hydrology (from Greek: Yδρoλoγια, Yδωρ+Λoγos, Hydrologia, the "study of water") is the study of the movement, distribution, and quality of water throughout the Earth, and thus addresses both the hydrologic cycle and water resources. A practitioner of hydrology is a hydrologist, working within the fields of either earth or environmental science, or civil and environmental engineering.
|
INFECTIOUS DISEASE |
|
In medicine, infectious disease or communicable disease is disease caused by a biological agent such as by a virus, bacterium or parasite.
|
INTERNET |
|
The Internet, or simply the Net, is the publicly accessible worldwide system of interconnected computer networks that transmit data by packet switching using a standardized Internet Protocol (IP). It is made up of thousands of smaller commercial, academic, domestic, and government networks. It carries various information and services, such as electronic mail, online chat, and the interlinked Web pages and other documents of the World Wide Web.
|
MARKET RESEARCH |
|
Market research is the process of systematic gathering, recording and analyzing of data about customers, competitors and the market. Market research can help create a business plan, launch a new product or service, fine tune existing products and services, expand into new markets etc. It can be used to determine which portion of the population will purchase the product/service, based on variables like age, gender, location and income level. It can be found out what market characteristics your target market has. With market research companies can learn more about current and potential customers.
|
METEOROLOGY |
|
Meteorology is the scientific study of the atmosphere that focuses on weather processes and forecasting. Meteorological phenomena are observable weather events which illuminate and are explained by the science of meteorology. Those events are bound by the variables that exist in Earth's atmosphere. They are temperature, pressure, water vapor, and the gradients and interactions of each variable, and how they change in time. The majority of Earth's observed weather is located in the troposphere.
|
POLLUTION |
|
Pollution is the release of environmental contaminants. Carbon monoxide, sulfur dioxide, chlorofluorocarbons (CFCs), and nitrogen oxides produced by industry and motor vehicles are common air pollutants. Sunlight converts nitrogen oxides and hydrocarbons to ozone or smog. Water pollutants may consist of a wide range of organic and inorganic chemicals such as heavy metals, petrochemicals, chloroform, and bacteria. Water pollution may also occur in the form of thermal pollution and dissolved oxygen depletion. Soil contamination is an important aspect of environmental pollution; this phenomenon occurs when chemicals are released by spill or underground storage tank leakage. Among the most significant soil contaminants are hydrocarbons, heavy metals, MTBE, herbicides, pesticides and chlorinated hydrocarbons. The U.S., Russia, China and Japan are the world leaders in air pollution emissions; however, Canada is the number two country on a per capita basis.
|
QUALITY ASSURANCE |
|
In engineering and manufacturing, quality control and quality engineering are involved in developing systems to ensure products or services are designed and produced to meet or exceed customer requirements and expectations. These systems are often developed in conjunction with other business and engineering disciplines using a cross-functional approach.
|
SURGERY - GENERAL |
|
Surgery (from the Greek cheirourgia meaning "hand work") is the medical specialty that treats diseases or injuries by operative manual and instrumental treatment. Surgeons may be physicians, dentists, or veterinarians who specialize in surgery.
A surgery can also refer to the place where surgery is performed, or simply the office of a physician, dentist, or veterinarian.
|
TECHNOLOGY |
|
Technology is a word with origins in the Greek "technologia" ("τεχνολογία") "techne", "τέχνη" ("craft") and "logia", "λογία" ("saying")." "Technology" is a broad term dealing with the use and knowledge of humanity's tools and crafts.
|
TRADEMARK INFRINGEMENT |
|
Trademark infringement is a violation of the exclusive rights attaching to a registered trademark without the authorisation of the trademark owner or any licensees. Infringement may occur when one party, the infringer, uses a trademark which is identical or confusingly similar to a registered trademark owned by another party, in relation to products or services which are identical or similar to the products or services which the registration covers. An owner of a registered trademark may commence legal proceedings against a party which infringes its registration.
|
UNIX - LINUX |
|
A "Unix-like" operating system is one that behaves in a manner similar to a Unix system, while not necessarily conforming to or being certified to any version of the Single UNIX Specification. The term can include free software / open source operating systems inspired by Bell Labs' Unix or designed to emulate its features, commercial and proprietary work-alikes, and even versions based on the licensed UNIX source code (which may be deemed so "Unix-like" that they are certified to bear the "UNIX" trademark). There is no formal standard for defining the term, and some difference of opinion is possible as to whether a certain OS is "Unix-like" or not.
|
|
Still can't find the expert you want?
|
Try using a broader keyword search or browse our Category Directory.
|
|
Data Center Construction Experts Witnesses - Data Center Construction Forensic Consultants.
Find Data Center Construction experts and consultants for Data Center Construction litigation support. Available to be Data Center Construction expert witnesses and provide Data Center Construction forensic consulting in Data Center Construction litigation, in addition prepare Data Center Construction expert witness reports for use in deposition and/or in-court trial testimony.
Get Local Help for Experts and Consultants in
Data Center Construction
|
|