Ewitness.com: Construction Delay Expert Witness Experts. Ewitness.com: Construction Delay Expert Witness Experts.
  Home Store Join Expert Login Terms/Policy Faq Logout
          Find an Expert by "keyword" Location: Submit "keyword": To search by category:
       Expert Witness
Expert Witness

Construction Delay Specialist, Expert Witness and Forensic Consultant.

Forensic investigations and litigation support ranging from the devastation of terrorist explosion to seismic structural damage, construction collapse and materials failure.

EXPERT ID: 340

Print this page

Location:  US

CLICK HERE TO CONTACT
THIS EXPERT OR TO RECEIVE
ADDITIONAL INFORMATION

 

Short Biography:

Specialties: Expert forensic structural investigations; Testing and evaluation of structural components and construction materials; Structural damage and condition assessments, integrity and serviceability assessments, and material durability assessments; Construction defects and delay claim analysis; Professional design standard of care evaluations; Non-destructive evaluation and testing; Structural diagnostics, field sensors and monitoring; Advanced structural analyses; Stability and buckling analyses; Seismic, dynamic, fatigue and vibration analyses; Expert witness testimony, litigation support, and demonstrative evidence. Professional memberships include National Academy of Engineering, NSPE, ASCE, ACI, and PCI. Extensive courtroom and deposition experience. Authored, or co-authored, over 160 technical papers.

Degrees/licenses: BS, MS, PhD; Civil/Structural engineer in 14 states


 

Blinded CV

Category Directories:

 

Category Searches:


 
Accident Reconstruction Expert Witnesses Directory   Accident Reconstruction Experts Witnesses ;
Corrosion Evaluations Expert Witnesses Directory   Corrosion Evaluations Experts Witnesses ;
Accident Investigation Expert Witnesses Directory   Accident Investigation Experts Witnesses ;
Cement / Concrete Expert Witnesses Directory   Cement / Concrete Experts Witnesses ;
Air Quality Expert Witnesses Directory   Air Quality Experts Witnesses ;
Construction Expert Witnesses Directory   Construction Experts Witnesses ;
Earthquakes Expert Witnesses Directory   Earthquakes Experts Witnesses ;
Engineering - General Expert Witnesses Directory   Engineering - General Experts Witnesses ;
Engineering - Mechanical Expert Witnesses Directory   Engineering - Mechanical Experts Witnesses ;
Materials Expert Witnesses Directory   Materials Experts Witnesses ;
Packaging And Labelling Expert Witnesses Directory   Packaging And Labelling Experts Witnesses ;
Plastics Expert Witnesses Directory   Plastics Experts Witnesses ;
Product Liability Expert Witnesses Directory   Product Liability Experts Witnesses ;

Some of the Keywords entered by this Expert:

Microscopical Examination Testing Floors Petrography Nondestructive Testing Ndt Component Sensors
Paving Flooring Consulting Testing Floors Nondestructive Testing Ndt Masonry
Building Envelope Sustainability Earthquakes Earthquakes Microscopical Examination Migration
Waste Management Reutilization Testing Analysis Flooring Consulting Mass Concrete Consulting Component Sensors
Transportation Systems Building Envelope Sustainability Engineering Construction Litigation Support Services Forensic Failure Investigations
Evaluation Rehabilitation Transportation Systems


Expert Witness
Copyright © 1996 - 2006 eWitness.com, LLC. All Rights Reserved. SiteMap Click here to view our Legal Disclaimer or Privacy Policy